Follow the progress of our Current Projects

We offer construction services to all businesses, regardless of the size, scope, or nature of the project for buildings of all types. Some of our current projects include:

Placon

placon-elevations.jpg
placon construction progress 4/6/21
placon construction progress 4/6/21
placon construction progress 4/6/21
placon construction progress 4/6/21
placon construction progress 4/5/21
placon construction progress 4/5/21
placon construction progress 4/5/21
placon construction progress 4/3/21
placon construction progress 3/31/21
placon construction progress 3/31/21
placon construction progress 3/31/21
placon construction progress 3/26/21
placon construction progress 03-15-2021
placon construction progress 03-11-2021
placon construction progress 02-3-2021
placon construction progress 02-02-2021
placon-construction-progress-1-21-2021.k.jpg
placon-construction-progress-1-17-2021.k.jpg
placon-contruction-progress-12-23-2020.k.jpg
placon-construction-progress-12-12-2020.k.jpg
placon-groundbreaking-ceremony.jpg
placon-elevation-thumb.jpg

Location: 2901 Oakland Ave. | Elkhart, IN 46517
Project Type: Medical device packaging facility plant expansion
Size: 44,000 SF
Owner: Placon
Architect: Curran Architecture
Project Manager: Scott DeMartinis
Start Date: November 30, 2020
Estimated Completion Date: August 31, 2021

Scope:
Holladay Construction Group's South Bend team has won the construction management contract for a 44,000 square foot plant expansion to Placon's existing medical device packaging facility in Elkhart, IN. The pre-engineered metal building addition features 10,000 square feet of office/administration space, a 34,000 square foot clean room facility for warehouse/production, as well as a new parking area. 

View similar projects »

Quincy Station

quincy-rendering.jpg
quincy station progress 3/24/2021
quincy station progress 3/24/2021
quincy station progress 3/24/2021
quincy station progress 12/17/20
quincy station progress 12/3/20 - precast
quincy station progress 11/30/20 precast
quincy station progress 112320-precast.jpg
quincy-112020-precast.jpg
quincy-110420-0026.jpg
quincy-110420-0020.jpg
quincy-102120-125702.jpg
quincy-102120-130452.jpg
quincy-20200923-090316.jpg
quincy-20200918-084405.jpg
quincy-20200916-123317.jpg
quincy-20200909-094121.jpg
quincy-932020-1132am.jpg
quincy-932020-1134am.jpg
quincy-20200819-1422.jpg
quincy-20200819-1420.jpg
quincy-20200817-151423.jpeg
quincy-20200714-0817.k.jpg
quincy-20200714-0819.k.jpg
quincy-20200714-0820.k.jpg
quincy-20200624-072234.jpg
quincy-20200604-102126.k.jpg
quincy-20200603-104108.jpg
quincy-thumb.jpg

Location: 1 West Quincy St. | Westmont, IN 60559
Project Type: New construction of a mixed-use multi-family residential community
Size: 125,371 Square Feet
Owner: HP Quincy Partners, LLC
Architect: Tandem Architecture
Project Manager: 
Scott Brown
Start Date: June 2020
Estimated Completion Date: March 2022

Scope:
Holladay Construction Group is serving as the General Contractor for Quincy Station, a new mixed-use multi-family residential community in Westmont, IL. The residential portion of the construction project will feature a 5-story building, incorporating below grade parking at the basement level as well as a first floor enclosed parking garage with 4 stories of luxury residential units above. The building which will include a common amenity space / club room at the upper floor of the building with an outdoor terrace overlooking Quincy Street and the downtown. The initial phase of the project included demolition of existing buildings and infrastructure and was completed in December 2019.

View similar projects »

WoodSpring Suites - Elgin, IL

elgin-rendering
Click right or left for construction progress photos
3/23/21 WoodSpring Suites Elgin Construction progress - building
3/23/21 WoodSpring Suites Elgin Construction progress - interior
3/23/21 WoodSpring Suites Elgin Construction progress - hotel room
3/22/21 WoodSpring Suites Elgin Construction progress - building
3/22/21 WoodSpring Suites Elgin Construction progress - interior fixtures
3/5/21 WoodSpring Suites Elgin Construction progress - building
3/5/21 WoodSpring Suites Elgin Construction progress - hallway
2/4/21 WoodSpring Suites Elgin Construction progress - building
2/5/21 WoodSpring Suites Elgin Construction progress - 3rd floor hallway
2/3/21 WoodSpring Suites Elgin Construction progress - room 334
wss-elgin-121720-0504.jpg
wss-elgin-121720-0507.jpg
wss-elgin-121720-0508.jpg
wss-elgin-121720-0512.jpg
wss-elgin-20201119-122425.jpg
wss-elgin-20201119-122540.jpg
wss-elgin-20200904-095025.jpg
wss-elgin-20200827-132519.jpg
wss-elgin-20200824-141851.jpg
wss-elgin-20200820-120031.jpg
wss-elgin-20200812-110438.jpg
wss-elgin-20200805-091558.jpg
wss-elgin-20200804-112435.jpg
wss-elgin-thumb.jpg

Location: 225 Point Blvd. | Elgin, IL 60123
Project Type: New Construction | Extended-Stay Hotel
Size: 48,660 Square Feet
Owner: HP WS-VIII Elgin, LLC
Architect: Holladay Properties
Project Manager: 
Frank Trapane
Start Date: August 2020
Estimated Completion Date: May 2021

Scope:
Holladay Construction Group, in conjunction with Holladay Properties and Choice Hotels, is building a new 57,700 square foot WoodSpring Suites extended-stay hotel in Elgin, IL. The four-story, 122-room project features a slab-on-grade, wood frames building with composition roof. The hotel includes a variety of rooms with queen or king-sized beds, and six accessible rooms. Hotel construction is expected to be completed in May 2021 and the hotel is slated to open in June 2021.

View similar projects »

Notre Dame Federal Credit Union

ndfcu-4521-082617web.jpg
ndfcu-4521-web.jpg
ndfcu-3821-85506.jpg
ndfcu-3821-85543.jpg
ndfcu-3221-073316.jpg
ndfcu-3221-072844.jpg

Location: 1200 119th St. | Whiting, IN 46394
Project Type: Interior improvements for a financial institution
Size: 3,696 square feet
Owner: Notre Dame Federal Credit Union/Holladay Properties
Architect: Holladay Properties
Project Manager: Nick Sebert
Start Date: 
March 1, 2021
Estimated Completion Date: June 18, 2021

Scope: 
Holladay Construction Group has been selected as the General Contractor for a 3,696 square foot interior build out within The Illiana in Whiting, IN for Notre Dame Federal Credit Union. This location will be the credit union's first branch in the Whiting market and the project features a spacious lobby with the teller station for four tellers, seven private offices and open office spacious for additional banking services, a public restroom, a break area and a private restroom for credit union employees, a conference room and storage and IT space . Construction began on March 1 and is expected to wrap up in June 2021.

Related News

Portage team earns Notre Dame Federal Credit Union contract

View similar projects »

Encore at Perry Crossing

encore-plainfield-03192021.jpeg
encore-plainfield-03222021.jpeg
encore-plainfield-03172021.jpeg
encore-plainfield-03032021.jpeg
encore-plainfiedl-121820-153756.jpg
encore-plainfield-012920.jpg
encore-plainfield-121820-143602.jpg
encore-plainfield-121820-152038.jpg
encore-plainfield-121820-153306.jpg
encore-plainfield-121820-153744.jpg
encore-plainfield-111020-152737.jpg
encore-plainfield-111020-152714.jpg
encore-plainfield-111020-152716.jpg
encore-plainfield-102320-framing.jpg
encore-plainfield-932020.jpg
encore-plainfield-942020.jpg
encore-plainfield-912020-235-sitework.jpg
encore-plainfield-912020-sitework.jpg
encore-plainfield-0825201316-sitework.jpg
encore-plainfield-0817200913-sitework.jpg
encore-plainfield-0728201052-sitework.jpg
encore-plainfield-thumb.jpg

Location: 584 Stone Table Blvd. | Plainfield, IN 46168
Project Type: Market Rate Senior Multi-Family Housing
Size: 193,991 square feet
Owner: Samaritan Companies
Architect: Heartland Design
Project Manager: Billy Mattingly
Start Date:
July 2020
Estimated Completion Date: October 2021

Scope: 
Our Indianapolis office is building a new, senior living multi-family housing community at in Plainfield, IN for Samaritan Companies - Encore at Perry Crossing. The project involves construction of a 132-unit, four-story, wood-framed facility comprised of a variety of one- and two-bedroom units. The project also features surface level parking, individual garage spaces in stand-alone buildings, and amenities including a community room, fitness center, leasing office, lounges, a second floor salon and storage units. Visit www.LiveEncore.com for a model tour, floor plans, or community information.

View similar projects »

Hampton Inn Crown Point

hampton-02262021-627.jpg
hampton-02222021-135.jpg
2/2/21 hampton inn construction progress
hampton-01082021-dji-0031.jpg
hampton-01082021-dji-0037.jpg
hampton-01082021-dji-0040.jpg
hampton-01122021-130447.jpg
hampton-122220.jpeg
hampton-121620-113820.jpg
hampton-120920-130545.jpg
hampton-1201-133732.jpg
hampton-1116-152753.jpg
hampton-111020-105523.jpg
hampton-1019-132121.jpg
hampton-20201217-080157.jpg
hamptoninn-10012020-0002.jpg
hamptoninn-10012020-0003.jpg
hamptoninn-9162020-124203.jpg
hamptoninn-08312020-094713.jpg
hamptoninn-08192020-155122.jpg
hamptoninn-08182020-133151.jpg
hamptoninn-08142020-104657.jpg
hamptoninn-08052020-091557.jpeg
hamptoninn.k.jpg
hamptoninn-072920-131948.jpg
hamptoninn-073020-084426.jpg
hamptoninn-thumb.jpg

Location: 10850 Delaware Pkwy. | Crown Point, IN 46308
Project Type: New Construction | Hotel
Size: 57,700 Square Feet
Owner: Good Hospitality Services
Architect: K2M Design
Project Manager:
Clayton Trueblood
Start Date: August 10, 2020
Estimated Completion Date: June 25, 2021

Scope:
Holladay Construction Group has been awarded the hospitality construction contract for a new 57,700 square foot hotel in Crown Point, IN. The Hampton Inn Crown Point is a four-story, 95 room hotel featuring an attached, single-story enclosed pool building, a spacious breakfast area, meeting room, and fitness center. The hotel includes a variety of rooms with double queen or king-sized beds, and six accessible rooms. Construction is expected to be completed in June 2021.

Learn more about our hotel construction services »

Winding Brook Industrial

Winding Brook Industrial elevations
3-3-21 winding brook industrial floor slab pour - morning
3-3-21 winding brook industrial floor slab pour - midday
3-3-21 winding brook industrial floor slab pour - afternoon
02-04-21 winding brook industrial construction progress
02-04-21 winding brook industrial construction site
02-04-21 winding brook industrial construction update
01-20-21 Winding Brook Industrial construction progress drone shot
01-20-21 Winding Brook Industrial drone shot
elevations-thumb.jpg
wbindustrial-011921-093513.jpg
wbindustrial-20201015-133036.jpg
wbindustrial-20201001-124640.jpg
wbindustrial-20200922-1233.jpg
wbindustrial-20200918-143627.jpg

Location: 1555 Lakeridge Pkwy. | Ashland, VA 23005
Project Type: New construction of an industrial spec building
Size: 100,000 SF
Owner: Winding Brook Industrial JV, LLC
Architect: Curran Architecture
Project Manager: Nick Sebert
Start Date: September 8, 2020
Estimated Completion Date: August 2021

Scope:
Holladay Construction Group is serving as the General Contractor for Winding Brook Industrial, a 100,000 square foot industrial spec building within the Winding Brook Business Park in Ashland, VA. The project is a joint venture development between Holladay Properties and one of the major land owners at Winding Brook, and is the first phase of a planned multi-phased, four-building, 640,000 SF industrial development on 45 acres in the Winding Brook park.

Learn more about our industrial building construction services »

Damar Village

damar-village-elevations-2.jpg
damar-village-elevations.jpg
damar-village-progress-022521-112652.jpg
damar-village-building-progress-01-04-21.jpg
damar-village-building-progress-01-29-21.jpg
progress-damar-12-18-3.jpg
progress-damar-12-18-8.jpg
progress-damar-12-18-2.jpg
progress-damar-12-15-5.jpg
progress-damar-12-15-9.jpg
damar-village-111020-100349.jpeg
damar-village-111020-100356.jpeg
damar-village-111020-100359.jpeg
damarvillage-20200909-072413.jpg
damarvillage-20200903-122502.jpg
damarvillage-20200831-141628.jpg
damarvillage-20200825-070437.jpg
damarvillage-20200820-102142.jpg
damarvillage-20200805-135539.jpg
damarvillage-20200721-144154.jpg
damarvillage-20200715-070642.jpg
damarvillage-20200709-125108.jpg
damar-village-061520-141647.jpeg
damar-village-060920-152903.jpeg
damar-village-051320-100338.jpeg
damar-village-elevation-thumb.jpg

Location: 6067 Decatur Blvd. | Indianapolis, IN 46241
Project Type: New construction of a 13.54-acre resident and office campus for Damar Services
Size: 13.54 Acres
Owner: Damar Services, Inc.
Architect: Curran Architecture
Project Manager: 
Pete Fromelius
Start Date: March 20, 2020
Estimated Completion Date: May 5, 2021

Scope:
Holladay Construction Group has been selected as the General Contractor for a new 13.54 acre residential and office campus for Damar Services, Inc. Holladay began construction of Phase I in March 2020, which includes site work as well as roads, walkways, and general utilities for the entire 17-building campus. Phase I includes construction of six single-story, 3,720 SF duplex dwelling units for patients. Each duplex unit includes four bedrooms and 2 bathrooms, as well as laundry, kitchen, living and dining rooms, and a back porch with storage. Phase I also includes construction of a two-story, 4,519 square foot Center Office Building for the complex, which features a welcome area, staff offices and kitchen area, meeting rooms, restrooms, and a recreation room.

View similar projects »

The Diversey

diversey-121820-112308.jpg
diversey-construction-progress-21421.jpg
diversey-121820-112306.jpg
diversey-121820-112307.jpg
diversey-121620-floor.jpg
diversey-121020-floor.jpg
11/17/20 Diversey construction progress
11/12/20 Diversey construction progress
10/13/20 Diversey construction progress - precast panels
10/13/20 Diversey construction progress
 9/29/20 Diversey construction progress
9/14/20 Diversey construction progress
9/9/20 Diversey construction - footings with steel
9/9/20 Diversey construction - footings
9/3/20 Diversey construction - site work
8/17/20 Diversey construction progress - site prep
8/17/20 Diversey construction progress - site clearing
8/17/20 Diversey building thumbnail

Location: 6340 AmeriPlex Dr. | Portage, IN 46368
Project Type: New construction of an industrial facility
Size: 52,900 SF
Owner: Portage Diversey, LLC
Architect: Curran Architecture
Project Manager: Clayton Trueblood
Start Date: August 2020
Estimated Completion Date: May 2021

Scope:
Holladay Construction Group is serving as the General Contractor for The Diversey Building, a 52,900 square foot flexible commercial building located within the AmeriPlex at the Port business park in Portage, IN. The facility features a six inch reinforced concrete slab floor, 24 foot clear ceiling height, six docks with recessed levelers and bumpers, and eight drive-in doors at 12 feet by 16 feet. The building offers a mix of commercial/retail space facing AmeriPlex Drive, and industrial space off of Prairie School Drive.

View similar projects »

WoodSpring Suites - Gurnee, IL

gurnee-color-elevations.jpg
2/3/21 woodspring gurnee construction progress
2/5/21 woodspring gurnee construction progress
wss-gurnee-020121.jpeg
wssgurnee-012521-140347.jpeg
wssgurnee-012021-082839.jpeg
wssgurnee-012021-091154.jpeg
wss-gurnee-0106621.jpeg
wss-gurnee-121720-0492.jpg
wss-gurnee-121720-0494.jpg
wss-gurnee-120920.jpg
wss-gurnee-120220.jpg
wss-gurnee-120120.jpeg
wss-gurnee-113020.jpeg
wss-gurnee-112020.jpg
wss-gurnee-111620.jpeg
wss-gurnee-110920.jpeg
wss-gurnee-103020.jpg
wss-gurnee-102720-134413.jpeg
wss-gurnee-102620-123849.jpeg
wss-gurnee-100620-123728.jpeg
wss-gurnee-093020-133435.jpeg
wss-gurnee-092520-124549.jpeg
wss-gurnee-092220-115701.jpeg
wss-gurnee-elevations-thumb.jpg

Location: 5742 Northridge Dr. | Gurnee, IL 60031
Project Type: New Construction | Extended-Stay Hotel
Size: 46,155 Square Feet
Owner: HP WS-IX Gurnee, LLC
Architect: Holladay Properties
Project Manager: 
Frank Trapane
Start Date: September 21, 2020
Estimated Completion Date: August 25, 2021

Scope:
Holladay Construction Group is building a new 46,000 square foot WoodSpring Suites extended-stay hotel in Gurnee, IL for Holladay Properties and Choice Hotels. The four-story, 114-room project features a slab-on-grade, wood framed building with composition roof. The hotel includes a variety of rooms with queen or king-sized beds, and seven accessible rooms, and features a spacious lobby, a fitness center and guest laundry room. Hotel construction kicked off in September 2020 and is expected to be completed in August 2021.

View similar projects »

Maple Lane Apartments

maple lane - building 1 - 1/4/21
maple lane - building 1 - 1/2/21
maple lane - building 1 - 12/10/20
maple lane building 1 - 12/2/20
maplelane-building1-111320.k.jpeg
maplelane-building1-111020.k.jpeg
maplelane-building1-10520.jpeg
maplelane-building1-92920.jpeg
maplelane-building1-91620.jpeg
maplelane-090220-083352.jpeg
maplelane-082020-080133.jpeg
maplelane-thumb.jpg
maplelane-8520-112256.jpeg
maplelane-8420-143257.jpeg
maplelane-8420-070022.jpeg
maplelane-8320-145843.jpeg
maplelane-73120-072336.jpeg
maplelane-72920-141214.jpeg

Location: 2001 Sugar Maple Lane | Elkhart, IN 46514
Project Type: New construction of a two multi-family residential buildings
Size: 27,466 Square Feet
Owner: Elkhart Maple Lane Associates LP
Architect: Kil Architecture
Project Manager: 
Scott DeMartinis
Start Date: July 2020
Estimated Completion Date: May 2021

Scope:
Holladay Construction Group has begun construction of two new multi-family residential buildings at Maple Lane Apartments & Executive Suites in Elkhart, IN. The project includes 28 one-bedroom one-bath units, with 16 in Building 1 and 12 in Building 2. Once complete, the community of Maple Lane Apartments will be home to 332 one and two-bedroom units.

Maple Lane Apartments Community Clubhouse

maple lane clubhouse 02/02/2021 progress
maple lane clubhouse 01/29/2021 progress
maple lane clubhouse - 01//28/2021 progress
maple lane clubhouse 01/2/2021
maple lane clubhouse demolition

Location: 2001 Sugar Maple Lane | Elkhart, IN 46514
Project Type: Total renovation of a community clubhouse
Size: 3,327 Square Feet
Owner: Elkhart Maple Lane Associates LP
Architect: Kil Architecture
Project Manager: 
Scott DeMartinis
Start Date: November 2020
Estimated Completion Date: May 2021

Scope:
Holladay Construction Group has begun a complete renovation of the community clubhouse at Maple Lane Apartments in Elhart, IN. Once complete, it will offer a number of luxury amenities to their residents including a state-of-the-art fitness room, a package room with 24-hour access, game room, computer station, and a dog wash station.